O.C. expects $83.2 million in federal funds for water projects
Orange County is planning to receive about $83.2 million in federal money over the next two years to fund watershed and flood-control projects, including the massive effort to reduce the potential for flooding along the Santa Ana River.
While the federal government has already authorized $45.9 million for this fiscal year, an additional $37.3 million is slated for approval with the 2015 federal budget, according to a list of recommended projects the U.S. Army Corps of Engineers released Tuesday.
The bulk of that money — $42 million approved for this year and $30.8 million recommended for 2015 — is designated for the Santa Ana River project, which Congress first approved in 1986.
The project will improve flood protection for communities along a 75-mile stretch of the river that passes through Orange, Riverside and San Bernardino counties.
As communities along the river have grown, a county website explains, existing flood-protection systems have grown less effective, including a shrinking of natural areas to absorb rainfall.
Among the spots to be improved are several dams and a degraded marsh at the mouth of the river, near the border of Newport Beach and Huntington Beach.
So far, the project has cost about $1.8 billion. The work is projected to be complete in the early 2020s.
Two other much smaller projects were also pegged for funds in the Army Corps’ list: a study to determine ways of stabilizing and restoring Aliso Creek and a study of flood damage in Westminster.
More to Read
Sign up for Essential California
The most important California stories and recommendations in your inbox every morning.
You may occasionally receive promotional content from the Los Angeles Times.